APU Medical Office Building

APU Medical Office Building, Anchorage 2016

This is a three story 34,295 sq. ft. structural steel brace frame core & shell building located on the Alaska Pacific University Campus in Anchorage.

We were asked to participate as design build team member from the concept phase, throughout the design-development, cost-development stages and construction phase.  The team consisted of Pfeffer Development, kpb Architects, DOWL Engineering, Reid Middleton, Inc., design build subcontractors included General Mechanical, Inc. and Alcan Electric, Inc. teaming with T3 Alaska, LLC.

We began site-work in March 2016 and completed the project on schedule in December 2016.  The project included a nicely landscaped site with heated sidewalks, high performance energy efficient exterior glass, exterior terracotta wall panels, two elevators, and energy efficient mechanical and electric systems.

Other major team mates include: BCX Excavating, Slana Surveying, Alaska Steel Company, AGGPRO, Inline Steel Fabricators, Core Brace, Andy Milner Company, Rainproof Roofing, Chinook Fire Protection, Commercial Contractors, Northwest Landscape, Rep Tile, Ron Webb Paving, Straightline, Statewide Door & Glass and Otis Elevator.